UPD was engaged to deliver the electrical servicing design for the UPD6174 MSKEA – Roe Highway Industrial Estate, a significant industrial green title subdivision comprising 35 industrial lots delivered across 10 or more development stages.

The project required a coordinated servicing strategy to accommodate the staged delivery of the estate while ensuring sufficient network capacity for the substantial long-term electrical demand.

Location: Kenwick, Western Australia

Year: 2018 – 2026

Services: Power Design, Strata Solutions

Network: Western Power


The development incorporated a combination of:

  • Major Project (MP) Western Power Design and Construct works.
  • Minor Services (MS) External Design and Construct works.
  • Staged HV and LV reticulation design.
  • Transformer and switchgear substation planning and integration.
  • Coordination with Western Power for network augmentation and staged energisation.

The estate had a projected maximum electrical demand of approximately 15 MVA, significantly exceeding the available capacity within the existing local distribution network.

To service this demand, the electrical design required:

  • Strategic staging of network infrastructure over multiple development phases.
  • Installation of more than 17 transformer and switchgear substation sites throughout the estate.
  • Careful load balancing and future capacity planning to ensure each stage could be energised without compromising the broader network.

A major network augmentation was ultimately required. As part of Stage 4B, a new 22 kV high-voltage feeder was designed from the Kenwick Zone Substation to provide the additional network capacity necessary to support the estate’s long-term electrical requirements.


  • Successfully developed a staged electrical servicing strategy for a complex multi-stage industrial estate.
  • Delivered designs integrating both Western Power MP and MS Design and Construct processes.
  • Facilitated a major 22 kV network augmentation to accommodate approximately 15 MVA of industrial load.
  • Planned and coordinated the installation of 17+ transformer and switchgear substation sites across the development.
  • Worked closely with Western Power to manage network constraints, staging, approvals and future capacity requirements, ensuring the estate could be delivered efficiently while supporting long-term industrial growth.